Enserve turns weather data and plant history into solar, wind and load forecasts, and delivers them to whoever needs them: a trading desk, an offtaker, or the system operator under the grid code’s data submission rules. It grew out of the forecasting and data submission work the GGSC team carried out for renewable plants, where the hard part was rarely the forecasting model. It was getting clean data in every day and the right file out on time.

Enserve is in early access. Sign-up and the current feature list are on enserve.ai.

What it does

  • Brings in plant and weather data from files, APIs, SCADA, databases and the major inverter monitoring platforms
  • Cleans the data with rule-based quality checks before it reaches a model
  • Runs day-ahead and intraday forecasts, with physics-based forecasts for new plants that have no history yet
  • Validates every forecast against measured generation, with accuracy and error analyses
  • Delivers forecasts on schedule, in the format and within the time window the recipient requires
  • Prices the imbalance charges of a Direct PPA and simulates battery dispatch, to show what forecast error costs

Inside Enserve

Enserve time-series view of a one-week day-ahead solar forecast in MW at 15-minute resolution, with the data table below the chart
A week of day-ahead solar forecasts at 15-minute resolution. Every value keeps its quality flag and the time the forecast was issued.
Enserve workspace with a project tree of PV plants on the left and actual against forecast AC power for one plant over several days on the right
Measured and forecast AC power of a PV plant in its analysis workspace. Error analysis, correlation, error distribution and feature-importance runs sit in the same tree as the data they were computed from.
Enserve delivery management screen listing hourly submissions of a six-hour production plan with status, record count, duration and payload
Scheduled delivery of a six-hour production plan under a grid code data submission clause. Every hourly run is logged with its payload; a run that would miss the submission window is stopped and reported instead of being sent late.
Enserve model validation page for a day-ahead solar model with accuracy metrics, a scatter plot of predicted against actual power, an error histogram and both series over time
Validation of a day-ahead solar model on a held-out test period: R², RMSE, MAE and MAPE, predicted against actual output, the error distribution, and both series over two weeks.

Talk to the team behind Enserve.

Questions about Enserve, or a project where it could help? The GGSC engineers who build it will answer.