An investment decision needs the engineering and the money in one model. We simulate how the plant or system would actually run, hour by hour under the contract or tariff that applies, and carry that result into the cash flow, so the financial case rests on an operating pattern that can be delivered.

Typical questions: how large a battery a solar plant needs to meet a partial-firm PPA; which mix of solar, storage and diesel serves an off-grid community at least cost and at what reliability; what aggregated distributed resources can offer as a virtual power plant; and where storage pays off across a utility’s substations.

What we assess

  • The hourly energy balance under the PPA or tariff terms: energy delivered, shortfall and curtailment
  • Equipment sizing, with sensitivity to prices, degradation and the resource year
  • Capital and operating costs, NPV, IRR and LCOE
  • The least-cost generation and storage mix for microgrids, with reliability measured as LOLE and ENS
  • The value of distributed energy resources aggregated as a VPP
  • The cost and benefit of grid-scale storage across substations, leading to a staged storage roadmap
Line chart of solar output, battery power and grid export by hour over one day, with grid export held flat from late morning to late afternoon and a second block in the evening
Hourly operating profile from a feasibility study of a hybrid solar PV and BESS plant. The battery (red) charges when solar output (green) is above the contracted export and discharges as solar falls, so the export to the grid (navy) stays flat from 10:00 to 16:00. After sunset the battery alone delivers a second, smaller block (its trace lies under the grid line). Negative battery power is charging.

How we work

STEP 01

Model the System

Develop or review network models, equipment data, plant models, and interconnection configurations.

STEP 02

Analyze Scenarios

Assess load flow, short circuit, voltage, loading, dynamic response, and operational conditions as required.

STEP 03

Evaluate Solutions

Compare technical options such as BESS, control changes, network reinforcement, or operating adjustments.

STEP 04

Deliver Findings

Provide engineering reports, study models, compliance documentation, and recommendations within the agreed scope.