Before a plant is allowed to export, the utility wants evidence that it rides through faults, supports frequency and voltage, and runs stably with the rest of the network. We build the plant model, simulate the cases the grid code prescribes, and assemble the evidence clause by clause, so the review is about the results and not about missing data.

For inverter-based plants the work centres on the plant controller and the inverter models; for synchronous plants such as cogeneration, on the generator, governor and exciter. RMS simulation covers most requirements. EMT simulation is used where fast inverter controls, a weak connection point or the utility’s request make RMS results insufficient.

What we assess

  • Low- and high-voltage ride-through (LVRT/HVRT), including reactive current injection during the fault
  • Active power recovery after the fault is cleared
  • Frequency response: droop setting and response to over- and under-frequency events
  • Reactive capability at the connection point across the active power range, and voltage control
  • Plant controller behaviour and its coordination with the inverters
  • Generator, governor and exciter response
Two time plots from an LVRT simulation over 15 seconds: the plant's active and reactive current in per unit, and the 115 kV bus voltage dropping to zero and recovering in steps along the grid code boundary
LVRT simulation of a utility-scale solar PV plant connected at 115 kV. Lower plot: the voltage at the 115 kV bus, dropped to zero and then recovered in steps along the grid code's ride-through boundary (dashed line). Upper plot: the current of the plant's two inverter groups in per unit. Reactive current (red and purple) rises to its maximum during the dip while active current (blue and green) falls close to zero; each returns to its pre-fault value as the voltage recovers.

How we work

STEP 01

Model the System

Develop or review network models, equipment data, plant models, and interconnection configurations.

STEP 02

Analyze Scenarios

Assess load flow, short circuit, voltage, loading, dynamic response, and operational conditions as required.

STEP 03

Evaluate Solutions

Compare technical options such as BESS, control changes, network reinforcement, or operating adjustments.

STEP 04

Deliver Findings

Provide engineering reports, study models, compliance documentation, and recommendations within the agreed scope.