When a contractor designs and builds the system, the owner still has to judge whether the design, the equipment and the tests are what the project needs. We sit on the owner’s side of the table: we review what the contractor submits, ask the questions an experienced engineer would ask, and check that what is handed over works and is documented.

The role suits power management systems, substations, protection and control, and renewable and storage plants, where acceptance depends on functional tests that are easy to underspecify.

What we review

  • Technical requirements and specifications before tender
  • Bids: technical compliance, deviations and risks
  • The contractor’s design documents, drawings and study reports
  • Factory and site acceptance test (FAT/SAT) procedures, and their results
  • Function and performance of the delivered system against the specification
  • As-built documents, settings and operator training at handover

How we work

STEP 01

Model the System

Develop or review network models, equipment data, plant models, and interconnection configurations.

STEP 02

Analyze Scenarios

Assess load flow, short circuit, voltage, loading, dynamic response, and operational conditions as required.

STEP 03

Evaluate Solutions

Compare technical options such as BESS, control changes, network reinforcement, or operating adjustments.

STEP 04

Deliver Findings

Provide engineering reports, study models, compliance documentation, and recommendations within the agreed scope.

Tell us what the project needs.

Send a short description, the timeline and any documents the utility or the contractor has issued. We will reply with a proposed scope and the data needed to start.

Discuss a Project ↗