A single peak-load snapshot no longer tells you whether a network can take more solar. Voltage rise and reverse power flow happen at midday on low-load days, and what a battery can do in any hour depends on what it did in the hours before. We simulate the network hour by hour across a full year, so limits show up when they actually occur and storage is sized against real operating patterns.

The work covers distribution networks with high rooftop PV at LV and MV, and sites that add solar and storage behind the meter, for utilities, industrial estates and large energy users.

What we assess

  • Hourly voltages and loading over a full year, not only at the peak-load snapshot
  • How much PV each feeder or bus can host before a limit is reached
  • Reverse power flow at transformers, and its effect on tap changers and protection
  • Battery power and energy ratings, state-of-charge limits and charge and discharge schedules
  • Operating strategies such as peak shaving, PV time-shifting and export limiting
  • The effect of inverter volt/var and volt/watt functions on hosting capacity
Step plot of a battery's active power over one day in hourly steps: positive through the night and evening, strongly negative from mid-morning to mid-afternoon
Hourly operating profile of a battery in a quasi-dynamic study of a 22 kV distribution network with high rooftop PV. The battery absorbs power (negative values) to take the surplus that would otherwise flow back upstream (reverse power flow) when PV output is high, and returns it in the evening and overnight, when the feeder imports (positive values).

How we work

STEP 01

Model the System

Develop or review network models, equipment data, plant models, and interconnection configurations.

STEP 02

Analyze Scenarios

Assess load flow, short circuit, voltage, loading, dynamic response, and operational conditions as required.

STEP 03

Evaluate Solutions

Compare technical options such as BESS, control changes, network reinforcement, or operating adjustments.

STEP 04

Deliver Findings

Provide engineering reports, study models, compliance documentation, and recommendations within the agreed scope.